Mechanical & Hydraulic System Ferry Terminal Upgrades

hydraulic power unit
custom cylinder assembly
sheave assembly

SPECIFICATIONS

  • Electric Dual Drum Hoist
  • Sheave Assemblies
  • Hydraulic Power Unit
  • Custom Cylinder Assemblies
  • Tubing Installation and On-Site Flushing

PROJECT DETAILS

In collaboration with their sister company, GCC, SIT engaged into a significant civil project aimed at enhancing a terminal on a vital ferry route connecting Seattle and Bainbridge Island. This specific ferry is renowned as one of the system’s busiest for walk-on passengers. The endeavor involved the replacement of the existing mechanical & hydraulic system, engineering to meet stringent seismic standards, and subsequently ensures enhanced safety and durability.

For this specialized undertaking, SIT delivered a meticulously crafted system that not only surpassed the specified requirements, but also seamlessly integrated with previously installed systems. The final product streamlined both operation and maintenance procedures. Through careful design evaluation, SIT and GCC optimized component selection, thereby minimizing project lead times and enhancing overall efficiency.

The comprehensive solution provided a range of essential elements, including:

  • Electric Dual Drum Hoist
  • Sheave Assemblies
  • Hydraulic Power Unit
  • Custom Cylinder Assemblies
  • Tubing Installation and On-Site Flushing

SIT and GCC collectively ensured the successful execution and long-term viability of the project.